BOQ & Estimation

Quantity take-off, item-wise BOQ, rate analysis and cost estimation for a clear financial roadmap.

BOQ & Estimation
Overview

Without a proper BOQ, cost control is guesswork. ARCITE PMC provides quantity take-off, item-wise bills of quantities, rate analysis and cost estimation so you have a financial roadmap tied to the drawings.

Accurate quantities support fair tendering, clearer contractor comparisons and better variation control later. Estimation is treated as a living management tool, not a one-time spreadsheet.

This service is central to our “turning drawings into certainty” promise in the quotation, audit and quality stream.

Quantity take-off and item-wise BOQ turn drawings into a commercial language. Rate analysis and estimation help owners understand likely cost ranges and compare contractor proposals fairly.

Without a BOQ baseline, variations become disputes. With one, changes can be measured and discussed with evidence.

ARCITE PMC links estimation to design quality: better drawings produce better quantities, which produce better financial control.

Estimates are ranges with assumptions. We make those assumptions visible — finish grades, provisional sums, exclusions — so owners are not shocked by “missing” items that were never priced.

Update the BOQ when design changes. An obsolete BOQ is worse than none because it creates false confidence. ARCITE PMC treats quantities as a managed baseline.

Compare contractor quotes against the same BOQ structure. Side-by-side item rates reveal where a low bid is simply incomplete.

Provisional sums should be listed openly and tracked; hidden allowances are where budgets quietly expand.

Who It Is For

Owners and project teams who need transparent quantities and costs before and during tendering.

When To Engage

Prepare BOQ and estimates before tendering, budgeting or contractor negotiation — and update them when the design changes materially.

How We Deliver
  • 01 Review drawing package completeness
  • 02 Quantity take-off and BOQ structuring
  • 03 Rate analysis / estimate development
  • 04 Issue for tender, budget or negotiation use
What We Cover
  • 01 Quantity take-off from drawings
  • 02 Item-wise BOQ preparation
  • 03 Rate analysis support
  • 04 Cost estimation for decision-making
Outcomes You Can Expect
  • Transparent commercial baseline
  • Stronger tender and negotiation position
  • Clearer link between design and budget